news

February 20, 2020 - Exterior improvements continue including removal of the cottonwood trees on the north property line, seat wall forms, site grading and storm water pond fence removal with fabric install. 
Interior work: Zones A & B - Painting continues, hallway relights installed, classroom ceiling grid is complete, and light fixtures, HVAC soft duct and grills are being installed. Electrical wiring is being pulled throughout all rooms with a focus on power outlets. 
Zone C upper area – Painting and wall covering will begin next week. Storefront doors and hardware are being installed. 
Lower Zone C Commons/Admin – Mechanical/Electrical/Plumbing rough-in is in full swing and cover inspection on March 2. 
Zone D - Wall covering continues this week along with storefront door install and hardware trim. Mechanical mezzanine units are placed with duct work being installed. The Commons roof will be complete tomorrow thanks to the break in the weather. Casework will arrive beginning February 28.

February 10, 2020 - Ceiling T-Bar and wall covering has been installed in both Zones A and B (existing building). Installation of light fixtures and HVAC grills has begun in those areas. In Zone C, sheetrock is being hung with tape/mud following. Painting and wall covering in Zone D is taking place. Electrical rough in of the administrative area is happening. The roof over the Commons will be dried in this week with the break in the weather. Exterior metal siding installation continues. Storefront windows are being installed in Zones D and C. The site water main on the west side of the building (121st Ave) in being installed with additional fire hydrants. Exterior site benches and footings for bridges are being poured


January 17, 2020:
The basic structure has taken shape. New siding is being installed on the exterior. Interior work is moving forward. 

November 19, 2019:
Follow Pope Elementary construction progress on the webcam!
May 5, 2019: Construction work begins on Pope Elementary remodel and expansion